For the On-going Construction of the Parish Rectory and Sound System

COST OF MATERIALS

BEAM:
16 MM D. BAR             -     6 pcs.    1,770.00
10 MM D. BAR             -     5 pcs.        575.00
12 MM D. BAR             –     2 pcs.        336.00
TIE WIRE #16              –    3 kgs.         180.00
POTRLAND CEMENT -   3 bags       624.00
ORD. PLYWOOD ¼     -   2 sheets    500.00
COCO LUMBER 2X2X12    6 pcs.      330.00
COCO LUMBER 2X3X12    3 pcs       225.00
COMMON NAIL #4             3 kgs.      140.00
COMMON NAIL #2 ½        2 kgs.      140.00
COMMON NAIL #1 ½          1 kg.        70.00
TOTAL     P4,890.00

4,890 / BEAM
15 BEAMS – P73,350.00

STEEL TRUSS:
ANGLE BARS 2X2X¼                            105 pcs.    60,375.00
FLAT BAR 1X1X¼                                      25 pcs.      6,250.00
WIELDING ROD WIPWELD 6013         40 kgs.      4,000.00
C-PURLINS 2X2X1/16                              52 pcs.    24,700.00
RED OXIDE METAL PRIMER              10 gallons    2,600.00
TOTAL     97,925.00

CONCRETE GUTTER:
12 MM D. BAR                      15 pcs.        2.250.00
10 MM D. BAR                     10 pcs.         1,150.00
TIE WIRE #16                      5 kgs.               300.00
PORTLAND CEMENT        20 bags        4,160.00
SAHARA                       20 Plastic Bag        600.00
ORD. PLYWOOD ¼             15 sheets    3,750.00
COCO LUMBER 2X2X12    36 pcs.        1,980.00
COCO LUMBER 2X3X12     9 pcs.             675.00
COMMON NAIL #4             4 kgs.               300.00
COMMON NAIL #2½        4 kgs.               300.00
COMMON NAIL #1½        2 kgs.                140.00
TOTAL     P15,875.00

Proposed Speakers for the Completion of Sound System Project
JBL Equipment:

JBL Control Monitor speaker series with mounting – 3 pairs – 19,980.00 – 59,940.00
Nutrik Mic pro. connector (USA) – 4 pcs. – 230.00 – 920.00
Nobelle Mic cable – 30 meters – 85.00/meter – 2,550.00
Neutrik Pro XLR connector – 4 – 230.00 – 920.00
Neutrik Pro S mount connector – 2 – 180.00 – 360.00
Mounting screw JBL – 16 – 25.00 – 400.00

Local Purchase:
Staple wire, cable ties, Tox screw etc. accs. – 200.00
P65.290.00

Optional:
AVR-UPS configured for PA 5 hrs. (USA) – 1 – 26,380.00

Add:
Shipment cost – 1,800.00
Labor cost – 900.00

Maximum Project Cost – P67,990.00